Wednesday 17 August 2011

Cabin sides

Build Day 17
Steve shaping the cabin top

Yesterday we saw Steve cutting the portholes in Yarwood's cabin sides - today the cabin sides forward of the engine stop are in situ.

Looking down the boat from the rear deck at the tumblehome (slope) of the cabin sides

Dollies fitted to the stern

4 comments:

  1. How were the large faux rivets made?

    bob

    ReplyDelete
  2. This makes you appreciate the craftsmanship which goes into the steelwork.

    ReplyDelete
  3. Bob
    The faux rivets are coach bolts that have been cut and drilled out. They are welded in place and ground.
    Lesley

    ReplyDelete
  4. Hi Captain
    We have been so impressed by the skill of these men and thoroughly enjoyed watching our boat emerge..
    Lesley

    ReplyDelete

Your comments are welcome, I love to read them and I try to respond to each but regretfully I will no longer accept comments from Anonymous.