We went up to see Yarwood yesterday afternoon. There were bodies everywhere working on different bits of her. In the hold a chap was fitting filler pipes to the secondary diesel tank and the water tank, having already fitted the filler pipe to the main diesel tank. In the galley, John was awaiting us for a decision on the shelving we wanted while Terry was working in the storage area ( we had drawn up a plan of this area over the weekend).
The engine had been positioned and bolted down on its oak bearers and Richard had made a start on the back cabin.
Engine in place on its new oak bearers
Floor down in the back cabin
Starboard side of the galley - we had just marked off where the shelves should be fitted.
Meanwhile, the Hurricane central heating unit had been delivered as well as the Tiffany style saloon lighting.
No comments:
Post a Comment
Your comments are welcome, I love to read them and I try to respond to each but regretfully I will no longer accept comments from Anonymous.