The table cupboard door and crumb drawer are now in situ and just awaiting the fitting of the oval mirror that will be placed at the top of the door
Dave Moore has finished the wood graining around the name panels. This just needs to dry and cure then several coats of varnish will be applied to seal and protect it.
The Back Cabin lamps have been mounted - these are LED as are all the rest of light fixtures
The tunnel lamp in place - not the greatest shot but you get the gist
There she is again and that great sheet of green painted steel behind the lamp is the opened deck hatch
The little but perfectly formed Faversham boat stove in place in the back cabin
The Faversham's stove pipe, formed and painted and drying
The black panels are fire boards to protect the cabin sides from the heat of the fire. The stove pipe will cover most of this when it is fitted and a few ribbon plates might just find a home hereabouts...
No comments:
Post a Comment
Your comments are welcome, I love to read them and I try to respond to each but regretfully I will no longer accept comments from Anonymous.